Mineral Water Plant: Business Plan





English: Damavand Mineral Water factory
Damavand Mineral Water factory (Photo credit: Wikipedia)
INTRODUCTION

The demand for mineral water is increasing at a rapid rate, as people become more health conscious and take precautions against water borne diseases.
Bottled mineral water provides easy transportability and assured water quality. 
THE PROJECT INVOLVES MACHINERY FOR
  • PURIFYING WATER
  • BOTTLE MANUFACTURING.
  • BOTTLING PURIFIED WATER.
  • LABELLING 
CAPACITY

The plant is being designed for minimum economically viable capacity, such that the capital outlay is optimized.
The capacity of the various units are as under:
-
Purification: 1000 litrers / hour i.e. 8000 litres / 8 hour shift
-
Bottle Manufacturing: 550 Bottles per hour per machine. 2 nos. machines will give 1100 bottles per hour i.e. 8800 bottles per 8 hour shift.
-
Bottling : 24 Bottles per minute of 1000 ml. i.e. 1440 Bottles / hour i.e. 11520 Bottles per 8 hour shift.
-
Labelling : Heat Shrink Tunnel would handle 1000 Bottles per hour.
All the 4 capacities have been nearly matched - for any adjustments some of the machines can be run for longer duration.
PROCESS FLOW
Related Posts Plugin for WordPress, Blogger...